Snapshot Progress 

Dec 02. This was about 1 week after picking up my chassis from Parallel. My build commenced on 25/11/02.
Viewed: 1002 times.
Feb 03. Radiators and pipework fitted.
Viewed: 985 times.
Feb 03. Rolling chassis taking shape
Viewed: 914 times.
May 03. By this time I had the basic mechanics sorted and a fully rolling chassis. I returned to Naz over the May bank holiday with chassis as I felt this would aid the transport of the body.
Viewed: 931 times.
May 03. My very expensive go kart.
Viewed: 1021 times.
May 03. Body shell ready for pick up.
Viewed: 958 times.
May 03. Body shell
Viewed: 916 times.
May 03. Shell fitted for journey home. Roll cage welded in at parallel.
Viewed: 1004 times.
May 03- Back home and the work really begins. My little boy Adam helping.
Viewed: 979 times.
June 03. Starting to attach bumpers for initial fit.
Viewed: 992 times.
June 03. Front of car with bumper mounted
Viewed: 930 times.
June 03. Nearside of car with front bumper mounted.
Viewed: 1078 times.
July 03. Rear shot with rear cover pulled out and tapped in place. Spoiler added for trail. All parts trial fitted.
Viewed: 1066 times.
July 03. Front end including all lights
Viewed: 944 times.
July 03. Rear bumper added for test fitment.
Viewed: 986 times.
Oct 03. Wiring loom in and lights working.
Viewed: 926 times.
Oct 03. Rear lights trial fitted and working.
Viewed: 963 times.
Nov-Dec 03. Doors being hung.
Viewed: 936 times.
Jan 2004. Current progress.
Viewed: 3127 times.
Jan 04. Side view
Viewed: 1363 times.
Powered by Gallery v1.4.2