Snapshot Progress 

Dec 02. This was about 1 week after picking up my chassis from Parallel. My build commenced on 25/11/02.
Viewed: 868 times.
Feb 03. Radiators and pipework fitted.
Viewed: 837 times.
Feb 03. Rolling chassis taking shape
Viewed: 777 times.
May 03. By this time I had the basic mechanics sorted and a fully rolling chassis. I returned to Naz over the May bank holiday with chassis as I felt this would aid the transport of the body.
Viewed: 803 times.
May 03. My very expensive go kart.
Viewed: 887 times.
May 03. Body shell ready for pick up.
Viewed: 830 times.
May 03. Body shell
Viewed: 793 times.
May 03. Shell fitted for journey home. Roll cage welded in at parallel.
Viewed: 874 times.
May 03- Back home and the work really begins. My little boy Adam helping.
Viewed: 840 times.
June 03. Starting to attach bumpers for initial fit.
Viewed: 863 times.
June 03. Front of car with bumper mounted
Viewed: 802 times.
June 03. Nearside of car with front bumper mounted.
Viewed: 939 times.
July 03. Rear shot with rear cover pulled out and tapped in place. Spoiler added for trail. All parts trial fitted.
Viewed: 927 times.
July 03. Front end including all lights
Viewed: 818 times.
July 03. Rear bumper added for test fitment.
Viewed: 857 times.
Oct 03. Wiring loom in and lights working.
Viewed: 801 times.
Oct 03. Rear lights trial fitted and working.
Viewed: 840 times.
Nov-Dec 03. Doors being hung.
Viewed: 804 times.
Jan 2004. Current progress.
Viewed: 2971 times.
Jan 04. Side view
Viewed: 1217 times.
Powered by Gallery v1.4.2